# APPOINTMENT OF A SERVICE PROVIDER FOR THE MIGRATION FROM GOOGLE WORKSPACE TO MICROSOFT 365, INCLUDING CONFIGURATION, DATA MIGRATION, TESTING, TRAINING, AND POST-IMPLEMENTATION SUPPORT.

> This tender closed on 2026-08-19.

- **Reference:** RFQ/SAEON/ULWAZI/MICRSOF 365 MIGRATION/90/2026
- **Issuer:** [National Research Foundation](https://za.bidwunder.com/tenders/issuer/national-research-foundation.md)
- **Region:** Western Cape
- **Type:** Request for quotation
- **Published:** 2026-08-11
- **Closing date:** 2026-08-19 13:00 SAST
- **Sectors:** [Research and development](https://za.bidwunder.com/tenders/sector/M72.md)

## Summary

#### Overview
**Procurement of an end-to-end migration from Google Workspace to Microsoft 365 E3, including configuration, data migration, testing, training, and 60-day post-implementation support for NRF SAEON.** Suitable bidders are Microsoft-certified partners with top-tier partner status and proven tenant-to-tenant migration experience, able to handle roughly 180 mailboxes (~4 TB), 180 Google Drive accounts (~7 TB), 22 Google Groups, 73 Shared Drives, and Google Vault data.

#### Requirements
- Compliance with NRF bidding rules (SBD1, SBD3.2, SBD4, SBD6.1; SBD6.2 where applicable) and proof of authority.  
- Tax compliance: SARS PIN/TCS status or CSD registration; separate submissions for joint ventures.  
- Central Supplier Database registration and valid BBBEE certificate or sworn affidavit; specific-goals considerations.  
- Active Microsoft Partner: Microsoft Solutions Partner (Cloud) or recognized Microsoft FastTrack Partner; provide official certificate and partner ID.  
- Detailed project methodology, including Phase 1 Pre-Migration Assessment (SSO usage audit and shared document/permissions mapping).  
- Full scope data loads: 180 mailboxes (~4 TB), 180 Google Drive accounts (~7 TB), 22 Google Groups, 73 Shared Drives (~105 GB), 1 Google Vault user (600 GB); optional third-party tools (e.g., MigrationWiz) at bidder’s cost.  
- Exclusions: AD integration/MFA and Outlook profile configuration handled by NRF; end-user training and ongoing managed services excluded.  
- Health and safety: COID good standing, safety plan, and site-induction requirements.  
- 60-day post-migration support with formal handover on completion.

#### How to Apply
- Submission deadline: 19 August 2026 at 11:00.  
- Submission method: via email to SCM@saeon.nrf.ac.za; PDFs only; 1 original bid document. (RFQ/SBD references and contact details in RFQ FOR MICROSOFT 365 MIGRATION..pdf)  
- Documents to submit: Completed SBD1 (with SBD4, SBD6.1), SBD3.2 pricing, proof of Microsoft Partner Tier, detailed methodology, pricing schedule, CSD/SARS proofs, BBBEE documentation.  
- Clarifications: via the NRF SCM contact; site briefing is not required.  
- Where to obtain bid documents: the attached RFQ document (RFQ FOR MICROSOFT 365 MIGRATION..pdf).

## Description

APPOINTMENT OF A SERVICE PROVIDER FOR THE MIGRATION FROM GOOGLE WORKSPACE TO MICROSOFT 365, INCLUDING CONFIGURATION, DATA MIGRATION, TESTING, TRAINING, AND POST-IMPLEMENTATION SUPPORT.

APPOINTMENT OF A SERVICE PROVIDER FOR THE MIGRATION FROM GOOGLE WORKSPACE TO MICROSOFT 365, INCLUDING CONFIGURATION, DATA MIGRATION, TESTING, TRAINING, AND POST-IMPLEMENTATION SUPPORT.

Delivery Location: 8th Floor, The Towers, - Cape Town - Corner, Hertzog Blvd, Foreshore - 8001

## Documents

- RFQ FOR MICROSOFT 365 MIGRATION..pdf

Documents download with a free BidWunder account.

## Published on

- [eTenders OCDS API](https://www.etenders.gov.za/Home/opportunities?id=1)

More open tenders: https://za.bidwunder.com/tenders.md

---

> Source: https://za.bidwunder.com/tenders/appointment-of-a-service-provider-for-the-migration-from-google-workspace-to-mic-777645ea
