# OAB-CPR-2026-10640 (IFB 11191) - DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TWO 1MW/2MWH BATTERY ENERGY STORAGE SYSTEMS FOR RODRIGUES ISLAND

> This tender closed on 2026-07-27.

- **Reference:** OAB-CPR-2026-10640 (IFB 11191)
- **Issuer:** [Central Electricity Board (CEB)](https://za.bidwunder.com/tenders/issuer/central-electricity-board-ceb.md)
- **Closing date:** 2026-07-27 15:30 +04
- **Sectors:** [Electrical equipment](https://za.bidwunder.com/tenders/sector/C27.md), [Electricity and gas](https://za.bidwunder.com/tenders/sector/D35.md)

## Summary

#### Overview
**This tender seeks the design, manufacture, supply, installation, testing and commissioning of two 1MW/2MWh Battery Energy Storage Systems for Rodrigues Island.** Bidders with experience in electrical engineering, energy-storage system integration, and EPC delivery of grid-scale storage projects should consider bidding. The submission deadline is 2026-07-27 11:30.

## Description

OAB-CPR-2026-10640 (IFB 11191) - DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TWO 1MW/2MWH BATTERY ENERGY STORAGE SYSTEMS FOR RODRIGUES ISLAND

## Documents

- Press Notice

Documents download with a free BidWunder account.

## Published on

- [Central Electricity Board (CEB) Mauritius](https://ceb.mu/procurement/tender)

More open tenders: https://za.bidwunder.com/tenders.md

---

> Source: https://za.bidwunder.com/tenders/oab-cpr-2026-10640-ifb-11191-design-manufacture-supply-installation-testing-and-18a8e71c
