# PRJ-26-08-002-KGM - Dozer Hiring for ARK project (Kibali Gold Mine / Drilling Platform Preparation, Access Road Construction and Post-Drilling)

> This tender closed on 2026-08-09.

- **Reference:** ARSP-1785788852
- **Issuer:** [Kibali Goldmines SA](https://za.bidwunder.com/tenders/issuer/kibali-goldmines-sa.md)
- **Type:** Open tender
- **Closing date:** 2026-08-09 11:00 WAT
- **Sectors:** [Civil engineering](https://za.bidwunder.com/tenders/sector/F42.md), [Specialised construction](https://za.bidwunder.com/tenders/sector/F43.md)

## Summary

#### Overview
**Dozer hiring services for the ARK project (Kibali Gold Mine), including drilling platform preparation, access road construction and post-drilling activities.** Bid should be of interest to mining/construction contractors with heavy earthmoving equipment hire capacity and experience on mining sites, capable of mobilising to Kibali project.

#### Requirements
- Capacity to provide dozers on hire for mining-site earthworks (drilling platform prep, road construction, post-drilling).
- Proven experience in mining or heavy earthworks and remote-site mobilisation.
- Compliance with safety, environmental and equipment maintenance standards; appropriate insurance and liability coverage.
- Operator services (if required) and ability to meet project timelines.

#### How to Apply
- Submission deadline: **2026-08-09 10:00** (Open Tender).
- Submission method: not specified in metadata; obtain tender documents from the issuer.
- Documents to complete/submit: not specified in metadata; refer to tender documents.
- Pre-qualifications: not specified in metadata; refer to tender documents.
- Briefing session: not specified.
- Where to obtain bid documents: not attached in metadata; contact Kibali Goldmines SA.

## Description

PRJ-26-08-002-KGM - Dozer Hiring for ARK project (Kibali Gold Mine / Drilling Platform Preparation, Access Road Construction and Post-Drilling)

## Published on

- [ARSP DRC Mining Subcontracting Tenders](https://appeldoffre.arsp.cd/detail/1785788852_YmIZahHoG6hjLau)

More open tenders: https://za.bidwunder.com/tenders.md

---

> Source: https://za.bidwunder.com/tenders/prj-26-08-002-kgm-dozer-hiring-for-ark-project-kibali-gold-mine-drilling-platfor-61939a27
