# PRJ-26-09-009-KGM - Geotechnical Drilling for the Kibali River Hydropower Project and Quarry/Borrow-Pit Material Exploration

> This tender closed on 2026-10-10.

- **Reference:** ARSP-1790629563
- **Issuer:** [Kibali Goldmines SA](https://za.bidwunder.com/tenders/issuer/kibali-goldmines-sa.md)
- **Type:** Open tender
- **Closing date:** 2026-10-10 11:00 WAT
- **Sectors:** [Civil engineering](https://za.bidwunder.com/tenders/sector/F42.md), [Specialised construction](https://za.bidwunder.com/tenders/sector/F43.md)

## Summary

#### Overview
**Geotechnical drilling services for the Kibali River Hydropower Project and quarry/borrow-pit material exploration**. Bidders with geotechnical drilling, site investigation, soil sampling, borehole logging and related civil-engineering support should consider bidding for this project, including operators with suitable drill rigs and field sampling capabilities for hydropower infrastructure.

#### Requirements
- Demonstrated experience in geotechnical drilling and site investigations for large civil infrastructure projects.
- Ability to deploy drilling rigs, sampling programs, borehole logging, and related analysis.
- Proven health, safety and environmental (HSE) compliance during field operations.
- Qualified personnel with geotechnical engineering or drilling qualifications.

#### How to Apply
- Submission deadline: 2026-10-10 10:00.
- Submission method: not specified in metadata.
- Documents to complete and submit: not specified.
- Required registrations or pre-qualifications: not specified.
- Briefing session details: not specified.
- Where to obtain bid documents: not specified.

## Description

PRJ-26-09-009-KGM - Geotechnical Drilling for the Kibali River Hydropower Project and Quarry/Borrow-Pit Material Exploration

## Published on

- [ARSP DRC Mining Subcontracting Tenders](https://appeldoffre.arsp.cd/detail/1790629563_8Z3V8uY3JkznoO4)

More open tenders: https://za.bidwunder.com/tenders.md

---

> Source: https://za.bidwunder.com/tenders/prj-26-09-009-kgm-geotechnical-drilling-for-the-kibali-river-hydropower-project-e461dfe7
