# REALISATION DES ETUDES TECHNIQUES DETAILLEES ET ETUDES ENVIRONNEMENTALES ET SOCIALES EN VUE DE LA CONSTRUCTION D'UNE CENTRALES HYDROELECTRIQUE SUR LA RIVIERE LUETA DANS LE TERRITOIRE DE LUIZA, PROVINCE DU KASAI CENTRAL

> This tender closed on 2026-08-14.

- **Reference:** CI-AMIn034/MITP/CI/BAD/2026
- **Issuer:** [Cellule Infrastructures (MITP)](https://za.bidwunder.com/tenders/issuer/cellule-infrastructures-mitp.md)
- **Type:** Open tender
- **Closing date:** 2026-08-14 12:00 WAT
- **Sectors:** [Architectural and engineering services](https://za.bidwunder.com/tenders/sector/M71.md), [Other professional services](https://za.bidwunder.com/tenders/sector/M74.md), [Electricity and gas](https://za.bidwunder.com/tenders/sector/D35.md)

## Summary

#### Overview
**Provision of detailed technical studies and environmental and social studies for the construction of a hydroelectric power plant on the Lueta River in Luiza Territory, Kasai Central Province.** Target bidders are engineering/consulting firms with hydroelectric project experience and capabilities in environmental and social impact assessments (ESIA) and related feasibility studies.

#### Requirements
- Proven experience in delivering detailed technical studies for hydroelectric projects
- Demonstrated capability to conduct ESIA and related environmental/social studies
- Qualified personnel with engineering and environmental/social expertise
- Ability to deliver integrated deliverables (technical studies, ESIA, socio-economic studies) within project scope and timeline

#### How to Apply
- Deadline: **2026-08-14 11:00**
- Submission method: not specified in metadata
- Documents to submit: not specified in metadata
- Pre-qualifications/registrations: not specified
- Briefing session: not specified
- Where to obtain bid documents: not specified

## Description

REALISATION DES ETUDES TECHNIQUES DETAILLEES ET ETUDES ENVIRONNEMENTALES ET SOCIALES EN VUE DE LA CONSTRUCTION D'UNE CENTRALES HYDROELECTRIQUE SUR LA RIVIERE LUETA DANS LE TERRITOIRE DE LUIZA, PROVINCE DU KASAI CENTRAL

## Published on

- [Cellule Infrastructures DRC Tenders](https://celluleinfra.org/offres/realisation-des-etudes-techniques-detaillees-et-etudes-environnementales-et-sociales-en-vue-de-la-construction-d-une-centrales-hydroelectrique-sur-la-riviere-lueta-dans-le-territoire-de-luiza-province-du-kasai-central)

More open tenders: https://za.bidwunder.com/tenders.md

---

> Source: https://za.bidwunder.com/tenders/realisation-des-etudes-techniques-detaillees-et-etudes-environnementales-et-soci-5ca3772c
