# Regret Letter - Supply and Delivery of LED Lighting for the period of Twelve (12) Months on “as and when required basis” at Megawatt Park (MWP).

> This tender closed on 2026-08-07.

- **Reference:** E2573GXEREREGRETLETTER
- **Issuer:** [ESKOM](https://za.bidwunder.com/tenders/issuer/eskom-2.md)
- **Region:** National
- **Type:** Request for proposal
- **Published:** 2026-07-07
- **Closing date:** 2026-08-07 12:00 SAST
- **Sectors:** [Electricity and gas](https://za.bidwunder.com/tenders/sector/D35.md)

## Summary

#### Overview
**Eskom is procuring the supply and delivery of LED lighting for twelve months on an as-and-when-required basis at Megawatt Park (MWP).** This RFP is for LED lighting products with delivery capability to Eskom Megawatt Park, targeting LED lighting suppliers/distributors with suitable supply and delivery capacity. An attached regret letter (Regret Letter for LED Lights - signed.pdf..pdf) notes Enquiry No. E2573GXERE and that the successful supplier is Kwadonga Holdings (Pty) Ltd.

#### How to Apply
- Submission deadline: 2026-08-07 10:00.
- Briefing session: Eskom Holdings SOC Limited, Sunninghill, Sandton, 2000.
- Submission method: not specified in the provided documents.
- Documents to submit: not specified in the provided documents.
- Required registrations/pre-qualifications: not specified in the provided documents.
- Obtaining bid documents: not specified in the provided documents.

## Description

Regret Letter - Supply and Delivery of LED Lighting for the period of Twelve (12) Months on “as and when required basis” at Megawatt Park (MWP).

Regret Letter - Supply and Delivery of LED Lighting for the period of Twelve (12) Months on “as and when required basis” at Megawatt Park (MWP).

Conditions: N/A

## Documents

- Regret Letter for LED Lights - signed.pdf..pdf

Documents download with a free BidWunder account.

## Published on

- [eTenders.gov.za](https://www.etenders.gov.za)

More open tenders: https://za.bidwunder.com/tenders.md

---

> Source: https://za.bidwunder.com/tenders/regret-letter-supply-and-delivery-of-led-lighting-for-the-period-of-twelve-12-mo-6fc14da2
