# REPLACEMENT OF AGEING ASBESTOS PIPE IN MAKHANDA - PHASE 4

> This tender closed on 2026-07-10.

- **Reference:** MLM/2025-26/INFRA/017
- **Issuer:** [Makana Local Municipality](https://za.bidwunder.com/tenders/issuer/makana-local-municipality.md)
- **Region:** Eastern Cape
- **Type:** Open tender
- **Published:** 2026-06-12
- **Closing date:** 2026-07-10 14:00 SAST
- **Briefing:** 2026-06-18 13:00 SAST (compulsory)

## Summary

#### Overview
**Open-Tender for Replacement of ageing asbestos pipe in Makhanda – Phase 4.** Makana Local Municipality seeks bids from civil/construction contractors with municipal water infrastructure experience, specifically pipe replacement projects.

#### Requirements
- Mandatory briefing on 2026-06-18 at 11:00, Makana Local Municipality City Hall, 86 High Street (TENDER ADVERT - 10 JUNE 2026.pdf..pdf).
- Bid documents available for purchase at R1672.00 (non-refundable) (TENDER ADVERT - 10 JUNE 2026.pdf..pdf).
- Submission deadline: 2026-07-10 at 12:00 (TENDER ADVERT - 10 JUNE 2026.pdf..pdf).

#### How to Apply
- Attend the mandatory briefing on 2026-06-18 at 11:00 at the briefing venue (86 High Street) (TENDER ADVERT - 10 JUNE 2026.pdf..pdf).
- Obtain bid documents for **R1672.00** from Makana Local Municipality (TENDER ADVERT - 10 JUNE 2026.pdf..pdf).
- Submit bids by 2026-07-10 at 12:00; submission method is not specified in the provided materials (TENDER ADVERT - 10 JUNE 2026.pdf..pdf). 
- Bid documents are associated with the advert file mentioned above.

## Description

REPLACEMENT OF AGEING ASBESTOS PIPE IN MAKHANDA - PHASE 4

REPLACEMENT OF AGEING ASBESTOS PIPE IN MAKHANDA - PHASE 4

Conditions: BID DOCUMENT IS AVAILABLE AT A R1672.00 Briefing Venue: MAKANA LOCAL MUNICIPALITY, CITY HALL

## Documents

- TENDER ADVERT - 10 JUNE 2026.pdf..pdf

Documents download with a free BidWunder account.

## Published on

- [eTenders.gov.za](https://www.etenders.gov.za)

More open tenders: https://za.bidwunder.com/tenders.md

---

> Source: https://za.bidwunder.com/tenders/replacement-of-ageing-asbestos-pipe-in-makhanda-phase-4-bb19227f
