# Supply, delivery and Installation of a Fiber Tunnel -Greenhouse with Wetwall Cooling System, Electrical Components, and Generator

> This tender closed on 2026-10-15.

- **Reference:** RFQ MUT 492/2026
- **Issuer:** [Mangosuthu University of Technology](https://za.bidwunder.com/tenders/issuer/mangosuthu-university-of-technology.md)
- **Region:** KwaZulu-Natal
- **Type:** Request for Quotation
- **Published:** 2026-10-01
- **Closing date:** 2026-10-15 11:00 SAST
- **Sectors:** [Specialised construction](https://za.bidwunder.com/tenders/sector/F43.md), [Electrical equipment](https://za.bidwunder.com/tenders/sector/C27.md), [Machinery](https://za.bidwunder.com/tenders/sector/C28.md)

## Summary

#### Overview
**The RFQ seeks the supply, delivery and installation of a Fiber Tunnel-Greenhouse with Wetwall Cooling System, Electrical Components, and Generator.** It targets bidders with greenhouse tunnel construction/installation experience and capability to supply the Wetwall system, smart controllers, switchboards and a generator, with BBBEE 80/20 requirements.

#### Requirements
- Stage 1: Administrative and mandatory documents (RFQ forms, company registration/vendor number, SARS Tax Compliance Status, two reference letters for similar greenhouse tunnel projects, product brochures/technical datasheets, warranty for major components).
- Non-mandatory: CSD MAAA number and BBBEE certificate.
- Stage 2: Price and Preference evaluation with firm prices, 90-day validity, VAT 15%, and BBBEE-based scoring (80/20 system).
- Additional: bid must be submitted to MUT by the closing date; MUT may accept part or none of the bid; 180 working days non-contact clause if not awarded.

#### How to Apply
- No briefing session (erratum). Clarifications to be directed to the MUT buyer by email.
- Obtain documents from MUT website (RFQ documents downloadable at https://www.mut.ac.za/tenders-procurement/). (see Tender Document)
- Submission deadline and method: 15 October 2026, 11:00; submit via email to deborah@mut.ac.za (no fax, late or electronic bids accepted).
- Documents to submit: completed RFQ forms; company registration or MUT vendor number; SARS Tax Compliance Status; two reference letters; product brochures/technical datasheets; warranty details; CSD/B-BBEE details optional but advantageous.
- Payment terms: 30 days in arrears upon receipt of valid invoice.
- Other: Clarifications to be directed to the buyer; if not contacted within 180 working days after closing, tender deemed unsuccessful.

## Description

Supply, delivery and Installation of a Fiber Tunnel -Greenhouse with Wetwall Cooling System, Electrical Components, and Generator

Supply, delivery and Installation of a Fiber Tunnel -Greenhouse with Wetwall Cooling System, Electrical Components, and Generator

BBBEE Scoring: 80/20 Mandatory Documents: Refer to a document

## Documents

- Tender Document

Documents download with a free BidWunder account.

## Published on

- [Mangosuthu University of Technology Tenders](https://www.mut.ac.za/wp-content/uploads/2026/10/rfq-492-2026e.pdf)

More open tenders: https://za.bidwunder.com/tenders.md

---

> Source: https://za.bidwunder.com/tenders/supply-and-delivery-of-a-fiber-tunnel-greenhouse-with-wetwall-cooling-system-ele-721ba28b
