# Supply, Installation, Commissioning, and Design of Coal Bunkers Unit 1 to 6 CO Gas Monitors and Interface to WinCC SCADA System at Kriel Power Station for a period of three (3) months.

- **Reference:** E3626GXMPKRI-
- **Issuer:** [Eskom Holdings SOC Limited Gauteng](https://za.bidwunder.com/tenders/issuer/eskom-holdings-soc-limited-gauteng.md)
- **Region:** Mpumalanga
- **Type:** Open tender
- **Closing date:** 2026-11-13 12:00 SAST
- **Sectors:** [Civil engineering](https://za.bidwunder.com/tenders/sector/F42.md), [Specialised construction](https://za.bidwunder.com/tenders/sector/F43.md)

## Summary

#### Overview
**Supply, Installation, Commissioning, and Design of Coal Bunkers Unit 1 to 6 CO Gas Monitors and Interface to WinCC SCADA System at Kriel Power Station for a period of three (3) months.** This tender targets vendors with industrial instrumentation, gas monitoring, and SCADA integration expertise (WinCC), capable of delivering design, installation, and commissioning at a power-plant site (Kriel Power Station, Nkangala District Municipality).

#### Requirements
- Expertise in CO gas monitoring systems for coal bunkers and associated safety monitoring.
- Ability to design, install, commission, and interface gas monitors with a WinCC SCADA system.
- Proven capability to perform works at a power-station site and deliver within a three-month period.

#### How to Apply
- Submission deadline: 13 November 2026 at 10:00 (local). 
- Submission method: not specified in the available metadata.
- Documents to complete: not specified in the available metadata.
- Pre-qualifications/registrations: not specified in the available metadata.
- Briefing/site briefing: Site meeting is available; exact date/venue to be confirmed.
- Documents access: Documents available from 26 October 2026; no attached documents are provided here (obtain per Eskom tender processes).

## Description

Supply, Installation, Commissioning, and Design of Coal Bunkers Unit 1 to 6 CO Gas Monitors and Interface to WinCC SCADA System at Kriel Power Station for a period of three (3) months.

Supply, Installation, Commissioning, and Design of Coal Bunkers Unit 1 to 6 CO Gas Monitors and Interface to WinCC SCADA System at Kriel Power Station for a period of three (3) months.

Documents available from: 26 October 2026 Site Meeting: Yes Municipality: Nkangala District Municipality

## Published on

- [CIDB i-Tender Register](https://registers.cidb.org.za/PublicTenders/TenderSearch)

More open tenders: https://za.bidwunder.com/tenders.md

---

> Source: https://za.bidwunder.com/tenders/supply-installation-commissioning-and-design-of-coal-bunkers-unit-1-to-6-co-gas-1e7287f5