# Transportation of day shift employees from Secunda to Tutuka Power Station as and when required for a period of 60 months.

> This tender closed on 2026-08-04.

- **Reference:** E2736GXMPTUTR
- **Issuer:** [Eskom - Generation](https://za.bidwunder.com/tenders/issuer/eskom-generation.md)
- **Region:** Mpumalanga
- **Type:** Professional Services Contract
- **Published:** 2026-07-17
- **Closing date:** 2026-08-04 10:00 SAST
- **Sectors:** [Land transport](https://za.bidwunder.com/tenders/sector/H49.md)

## Summary

#### Overview
**Transportation of day shift employees from Secunda to Tutuka Power Station on an as-needed basis for up to 60 months.** Bidders with passenger transport capabilities and compliance with SA licensing and safety standards should consider bidding.

#### Requirements
- Not specified in the available metadata; bidders should consult the bid documents on the Eskom E-Tendering portal for detailed qualifications, licensing, safety, insurance requirements, and any pre-qualification criteria.

#### How to Apply
- Submission deadline: 2026-08-04 08:00.
- Submission method: Online via Eskom E-Tendering portal.
- Documents to submit: Bid response and any forms as per bid documents (no attachments provided here).
- Pre-qualifications: Check portal for any registrations or pre-qualifications required.
- Where to obtain bid documents: Via Eskom E-Tendering portal (no documents attached here).

## Description

Transportation of day shift employees from Secunda to Tutuka Power Station as and when required for a period of 60 months.

Transportation of day shift employees from Secunda to Tutuka Power Station as and when required for a period of 60 months.

Tender Office Location: E-Tendering

## Documents

- Tender documents (9 files).zip

Documents download with a free BidWunder account.

## Published on

- [Eskom Tender Bulletin](https://tenderbulletin.eskom.co.za/tender/95707)

More open tenders: https://za.bidwunder.com/tenders.md

---

> Source: https://za.bidwunder.com/tenders/transportation-of-day-shift-employees-from-secunda-to-tutuka-power-station-as-an-c0a6a5fe
