# Upgrade HMI simulator at Matla Power Station for a period of two (02) years

> This tender closed on 2026-10-23.

- **Reference:** E3493GXMPMAT
- **Issuer:** [Eskom - Generation](https://za.bidwunder.com/tenders/issuer/eskom-generation.md)
- **Region:** Mpumalanga
- **Type:** Expression of interest
- **Published:** 2026-09-08
- **Closing date:** 2026-10-23 10:00 SAST
- **Sectors:** [Computer and electronic products](https://za.bidwunder.com/tenders/sector/C26.md), [IT services](https://za.bidwunder.com/tenders/sector/J62.md), [Electrical equipment](https://za.bidwunder.com/tenders/sector/C27.md)

## Summary

#### Overview
**Upgrade HMI simulator at Matla Power Station for a period of two (02) years.** Eskom invites bids to upgrade and integrate the HMI simulator at Matla PS, including software/hardware updates, testing and ongoing support over a 2-year period. Suitable bidders are providers with HMI/SCADA, control-systems integration, software/hardware deployment, and Eskom procurement/compliance capabilities. Key qualifications include Eskom SHE compliance, CIDB registration (as applicable), and the ability to complete the required tender documentation and declarations. 

#### Requirements
- Compliance with Eskom SHE rules and safety acts (OHSA, MHSA where applicable, NEMA).
- Integrity and ethical conduct: complete Annexure A Integrity Declaration and adhere to the Eskom Supplier Integrity Pact; NDA obligations apply.
- Eligibility: meet Tender Data criteria (no sanctions, not on tender defaulters or Eskom restrictions; not sub-contract 100% of scope).
- CIDB requirements: CIDB grade/CPG/CSDG applicability as per contract scope.
- Local content and CPA: complete CPA Annexures E/F and Local Content declarations G1–G4 when designated materials apply.
- Documentation: submit SBD 1, SBD 4, SBD 6.1, SBD 6.2 and all Annexures A–F, plus Pricing Schedule/BOQ (PDF and Excel).
- Submissions: electronic via Eskom E-tendering; PDFs (max 500 MB per document) and a combined 4 GB limit; pricing in PDF and Excel.
- Pre-qualifications: CIDB registration, tax clearance, and completion of the PAYE/ supplier evaluation requirements where applicable. 

#### How to Apply
- Closing date/time: 05 October 2026 at 10:00 (IT Tdoc). 
- Briefing/clarification: non-mandatory meeting 17 September 2026 at 12:00 via Microsoft Teams; site visits by appointment (masinap@eskom.co.za).
- Submission method: upload electronically to the Eskom E-tendering site; documents uploaded under Technical/Commercial/Financial folders; ensure tender is marked complete; no hard copies accepted.
- Documents to complete/submit: Annexures A–F, C, D; SBD 1, SBD 4, SBD 6.1, SBD 6.2; Tax PAYE questionnaire (Supplier Evaluation Pack); Pricing Schedule/BOQ (PDF + Excel); Annexure L (Authority to Submit a Tender).
- Additional access: bid documents and annexures are listed in the ITT and available via the Eskom Tender Bulletin/E-tendering portal. (Invitation to Tender (ITT) - HMI simulator.final.docx)

## Description

Upgrade HMI simulator at Matla Power Station for a period of two (02) years

Upgrade HMI simulator at Matla Power Station for a period of two (02) years

Tender Office Location: Eskom E - Tendering

## Documents

- Tender documents (43 files).zip
- SBD 1 - Invitation to Bid..pdf..pdf
- Supplier Integrity Pack.pdf..pdf
- Standard Bidding Document (SDB) 4\_Annexure A.pdf..pdf
- Supplier Risks identified Rev 1 Oct 2009.pdf..pdf
- NDA Vendors.pdf..pdf
- Annexure B Safety Requirements.pdf..pdf
- Annexure L – Authority to Submit a Tender (Returnable Schedule) Template.pdf..pdf
- Invitation to Tender (ITT) - HMI simulator.final.pdf signed.pdf..pdf
- Environmental Contractors Assessment Form.pdf..pdf
- Annexure C.pdf..pdf
- Eskom Supplier Integrity Pact - 02 June 2023.pdf..pdf
- Annexure E.pdf..pdf
- No 5 ANNEXURE A Integrity Declaration Form (1).pdf..pdf
- Supplier\_Evaluation\_Pack\_Template\_for\_01\_March\_2024\_to\_29\_February\_2025.pdf..pdf
- TAX EVALUATION.pdf..pdf
- Contractors Assessment Form.pdf..pdf
- SWORN AFFIDAVIT – B-BBEE EXEMPTED MICRO ENTERPRISE - GENERAL.pdf..pdf
- Authorisation Form - Final.f.pdf..pdf
- SWORN AFFIDAVIT – B-BBEE QUALIFYING SMALL ENTERPRISE - GENERAL.pdf..pdf
- Conditions to tender.pdf..pdf
- Code of Ethics.pdf..pdf
- Eskom Supplier Integrity Pact.pdf..pdf
- SBD 6.2.pdf..pdf
- SBD 6.1 - Preference Points Claims Form..pdf..pdf
- E-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.pdf..pdf
- No 4 SBD 6.2 Local Content in terms of PPR 2017.pdf..pdf
- Eskom - Standard Conditions of Tender.pdf..pdf
- Eskom - Standard Conditions of Tender - final.pdf..pdf
- Authority to submit a tender Nov 2012.pdf..pdf
- Attachment 5\_ANNEXURE A Integrity Declaration Form.pdf..pdf
- Declaration of Fair Bidding Practices.pdf..pdf
- Eskom Standard Condition.pdf..pdf
- No 11 Designated items Local Content percentages THRESHOLDS.pdf..pdf
- Supplier Evaluation Pack Template for 01 March 2023 to 29 February 2024.pdf..pdf
- Authorisation Form - final.pdf..pdf
- SBD 1.pdf..pdf
- Eskom General Conditions of Purchase - 31 May 2024.pdf..pdf
- Annexure D.pdf..pdf
- E-tendering Help Manual for supplier - 27 January 2025.pdf..pdf

Documents download with a free BidWunder account.

## Published on

- [Eskom Tender Bulletin](https://tenderbulletin.eskom.co.za/tender/96213)
- [eTenders.gov.za](https://www.etenders.gov.za)

More open tenders: https://za.bidwunder.com/tenders.md

---

> Source: https://za.bidwunder.com/tenders/upgrade-hmi-simulator-at-matla-power-station-for-a-period-of-two-02-years-83a3c5bf