This tender closed on 19 Aug 2026. The page stays up for reference. See open tenders from National Research Foundation.
APPOINTMENT OF A SERVICE PROVIDER FOR THE MIGRATION FROM GOOGLE WORKSPACE TO MICROSOFT 365, INCLUDING CONFIGURATION, DATA MIGRATION, TESTING, TRAINING, AND POST-IMPLEMENTATION SUPPORT.Closed
Summary
AI-generated from the tender documents.
Overview
Procurement of an end-to-end migration from Google Workspace to Microsoft 365 E3, including configuration, data migration, testing, training, and 60-day post-implementation support for NRF SAEON. Suitable bidders are Microsoft-certified partners with top-tier partner status and proven tenant-to-tenant migration experience, able to handle roughly 180 mailboxes (~4 TB), 180 Google Drive accounts (~7 TB), 22 Google Groups, 73 Shared Drives, and Google Vault data.
Requirements
- Compliance with NRF bidding rules (SBD1, SBD3.2, SBD4, SBD6.1; SBD6.2 where applicable) and proof of authority.
- Tax compliance: SARS PIN/TCS status or CSD registration; separate submissions for joint ventures.
- Central Supplier Database registration and valid BBBEE certificate or sworn affidavit; specific-goals considerations.
- Active Microsoft Partner: Microsoft Solutions Partner (Cloud) or recognized Microsoft FastTrack Partner; provide official certificate and partner ID.
- Detailed project methodology, including Phase 1 Pre-Migration Assessment (SSO usage audit and shared document/permissions mapping).
- Full scope data loads: 180 mailboxes (~4 TB), 180 Google Drive accounts (~7 TB), 22 Google Groups, 73 Shared Drives (~105 GB), 1 Google Vault user (600 GB); optional third-party tools (e.g., MigrationWiz) at bidder’s cost.
- Exclusions: AD integration/MFA and Outlook profile configuration handled by NRF; end-user training and ongoing managed services excluded.
- Health and safety: COID good standing, safety plan, and site-induction requirements.
- 60-day post-migration support with formal handover on completion.
How to Apply
- Submission deadline: 19 August 2026 at 11:00.
- Submission method: via email to SCM@saeon.nrf.ac.za; PDFs only; 1 original bid document. (RFQ/SBD references and contact details in RFQ FOR MICROSOFT 365 MIGRATION..pdf)
- Documents to submit: Completed SBD1 (with SBD4, SBD6.1), SBD3.2 pricing, proof of Microsoft Partner Tier, detailed methodology, pricing schedule, CSD/SARS proofs, BBBEE documentation.
- Clarifications: via the NRF SCM contact; site briefing is not required.
- Where to obtain bid documents: the attached RFQ document (RFQ FOR MICROSOFT 365 MIGRATION..pdf).
APPOINTMENT OF A SERVICE PROVIDER FOR THE MIGRATION FROM GOOGLE WORKSPACE TO MICROSOFT 365, INCLUDING CONFIGURATION, DATA MIGRATION, TESTING, TRAINING, AND POST-IMPLEMENTATION SUPPORT. APPOINTMENT OF A SERVICE PROVIDER FOR THE MIGRATION FROM GOOGLE WORKSPACE TO MICROSOFT 365, INCLUDING CONFIGURATION, DATA MIGRATION, TESTING, TRAINING, AND POST-IMPLEMENTATION SUPPORT. Delivery Location: 8th Floor, The Towers, - Cape Town - Corner, Hertzog Blvd, Foreshore - 8001
- RFQ FOR MICROSOFT 365 MIGRATION..pdf
Want tenders like this one in your inbox?
Create a free account to search every open tender and download the documents.