This tender closed on 11 Sept 2026. The page stays up for reference. See open tenders from ESKOM.
Approved Professional person (APP) for the period 5 years and perform stability analysis in 2 years intervals at Matla Power station Ash DamsClosed
Summary
AI-generated from the tender documents.
Overview
This procurement seeks the appointment of an Approved Professional Person (APP) for a 5-year term to perform stability analyses in 2-year intervals at Matla Power Station Ash Dams. Eligible bidders are engineering consultancies with APP status and demonstrated expertise in dam stability analysis, specifically for ash dams.
Requirements
- Must hold Approved Professional Person (APP) status and have relevant dam stability analysis experience.
- Demonstrated ability to perform stability analyses for ash dams and deliver interval reports every ~2 years during the 5-year term.
- Availability to operate on-site at Matla Power Station and comply with Eskom procurement processes.
- Ability to commence within the contract window and adhere to project timelines.
How to Apply
- Deadline: 11 September 2026 at 11:00.
- Briefing/site visit: briefing address listed as Matla Power Station, Kreil, Kriel 2271 (specific session details not provided).
- Submission method: not specified in the available documents.
- Documents to submit: not listed in the metadata; typical Eskom processes imply APP-related submissions, but exact forms are not enumerated here.
- Pre-qualifications/registrations: not explicitly stated.
- Where to obtain bid documents: not specified; refer to the enquiry E1034GXMTL and contact the issuer for details. Enquiries contact: Molapo B.E. (MolapoBE@eskom.co.za; 017-612-6966).
- Attached references: bidder names listed in related publications (e.g., Jones & Wegener (Pty) Ltd; Mimisa Engineering (Pty) Ltd; Zitholele Engineering (Pty) Ltd). A regret letter exists for the E1034GXMTL enquiry.
Approved Professional person (APP) for the period 5 years and perform stability analysis in 2 years intervals at Matla Power station Ash Dams Approved Professional person (APP) for the period 5 years and perform stability analysis in 2 years intervals at Matla Power station Ash Dams Conditions: N/A
- Publication of Names of Bidders iro advertised Competitive Bids - Appoitment of A professional Person E1034GXMTL.pdf..pdf
- Regret Letter E1034GXMTL.pdf..pdf
- Publication of Names of Bidders iro advertised Competitive Bids - Appoitment of A professional Person E1034GXMTL.pdf
Want tenders like this one in your inbox?
Create a free account to search every open tender and download the documents.