CDC/323/26 - CONSTRUCTION OF RETURN EFFLUENT DISTRIBUTION WATER INFRASTRUCTURE TO ZONES 3, 5, 6, 7 AND 9 OF THE COEGA SEZ – PHASE 3Closed

Summary

AI-generated from the tender documents.

Overview

Construction of return-effluent water distribution infrastructure for Zones 3, 5, 6, 7 and 9 of the Coega SEZ – Phase 3. Open to capable contractors with a CIDB grading of 8CE or higher. The scope covers bulk and distribution pipelines and ancillary works, including site establishment, H&S, environmental compliance, HDD/pipe jacking, various pipe materials (DN1200 steel, DN900 steel, DN800 steel, DN750 concrete, DN710 HDPE, DN600 steel, DN400 PVC-U), valve chambers, meters, scour and air valves, trenches, backfilling, landscaping, and as-built surveys, with a 12-month construction period.

Requirements

  • CIDB grading of 8CE or higher (mandatory).
  • Demonstrated capability to execute bulk water pipeline construction across multiple diameters and materials (steel, HDPE, concrete, PVC-U) and related works (HDD/pipe jacking, valve and meter installations).
  • Ability to manage Health & Safety, traffic accommodation, environmental compliance, site establishment, and site clearance.

How to Apply

  • Submission deadline: 17 August 2026 at 08:00.
  • Submission method: Not specified in the metadata.
  • Documents to submit: Not specified in the metadata.
  • Required registrations/pre-qualifications: CIDB registration at 8CE or higher.
  • Briefing session details: Not provided.
  • Where to obtain bid documents: No documents attached in metadata; none available here.
Description

CDC/323/26 - CONSTRUCTION OF RETURN EFFLUENT DISTRIBUTION WATER INFRASTRUCTURE TO ZONES 3, 5, 6, 7 AND 9 OF THE COEGA SEZ – PHASE 3 The CDC invites capable and competent contractors with a CIDB grading of 8CE or higher to submit tenders for the Construction of Return Effluent Water Infrastructure for Zones 3, 5, 6, 7, and 9 of the Coega SEZ – Phase 3. The extent of the planned works includes the construction of new bulk and distribution pipelines and ancillary works. The following main elements for the project in terms of scope of works are, inter alia: • Site establishment • Health & Safety, including traffic accommodation • Environmental compliance and management • Plant search and rescue and site clearance • Pipe trench excavations, shoring and backfilling • Supply and lay of return-effluent pipelines: • ±1300m DN1200 steel • ±650m DN900 steel • ±1300m DN800 steel • ±310m DN750 Concrete • ±35m DN710 HDPE • ±30m DN600 steel • ±300m DN400 PVC-U • Pipeline tie-in (Zone 3/4/5) • Horizontal Directional Drilling and pipe jacking under roads and railways, including the supply of HDPE pipes • Air valve installations and chambers • Scour valve installations and chambers • Isolation valve installations and chambers • Zonal meter installations and chambers • Barricading all earthworks and trenches • Landscaping rehabilitation • Survey as-builts The scope of work is detailed in the bid document. The construction period will be 12 months from the commencement date.

Documents
  • CDC/323/26 Tender Documents
  • CDC-323-26_Book 2.pdf..pdf
  • Tender Advert - CDC-323-26.pdf..pdf
  • CDC-323-26_Book 1.pdf..pdf