DESIGN AND SUPPLY TRANSFORMER CORES AND SHUNTS FOR A PERIOD OF 5 YEARS AT ERI

Summary

AI-generated from the tender documents.

Overview

Procurement of design and supply transformer cores and shunts for a 5-year period at ERI. Eskom invites bidders with capabilities in electrical equipment design, transformer components manufacture, ISO 9001-based QMS and SHE compliance to bid for the design and supply of transformer cores and shunts for Eskom ERI over five years.

Requirements

  • ISO 9001-based Supplier Quality Management System with evidence: Quality Plan, Contract Quality Plan, Quality Control Plan and QMS for supplier and sub-suppliers.
  • Post-contract QA: contract execution, supplier quality performance monitoring, and supplier quality audits.
  • SHE and health and safety compliance: adhere to Eskom Contractor Health and Safety Requirements (32-136), SHE Rules, inductions, Permits to Work, and contractor management; Annexure B acknowledgement.
  • Tender returnables: complete SBD 1, SBD 4, SBD 6.1, SBD 6.2 and attach Annexures A–J, Tax Questionnaire; CIDB/CSDG where applicable; local content declarations if designated materials.
  • Clarification/Scope: design and supply of transformer cores and shunts for 5 years; non-compulsory clarification meeting (19 Oct 206) via Teams.

How to Apply

  • Submission deadline: 30 October 2026 at 08:00; electronic submission via Eskom e-tendering site.
  • Clarification meeting: Non-compulsory, 19 October 206 at 10:00 via Microsoft Teams (link in tender documents).
  • Documents to obtain/submit: Invitation to Tender Shunts & Cores 09102026.pdf; Annexures A–J; SBD forms; Tax/corporate registration requirements; Local Content declarations for designated materials (as applicable).
Description

DESIGN AND SUPPLY TRANSFORMER CORES AND SHUNTS FOR A PERIOD OF 5 YEARS AT ERI DESIGN AND SUPPLY TRANSFORMER CORES AND SHUNTS FOR A PERIOD OF 5 YEARS AT ERI Tender Office Location: ERI Lower Germiston Road Roscherville Johannesburg South

Documents
  • Tender documents (15 files).zip
  • 240-106084675 Annexure C 3.docx..docx
  • 240-126469599 (Rev 2) - Method Statement - Template.docx..docx
  • E-tendering Help Manual for supplier - 27 January 2025.docx..docx
  • 240-108987034 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work).docx..docx
  • Shunts and cores Scope of Work.pdf..pdf
  • Functional evaluation criteria- shunts and cores - Annexure 1.pdf..pdf
  • 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements (2).pdf..pdf
  • 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf..pdf
  • 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf..pdf
  • Contractor Health and Safety Requirements (Latest Revision) (2).pdf..pdf
  • 240-68099512 Form A_Cat 4_ Rev 9.pdf..pdf
  • 240-106084675 Annexure C3 OHS Tender Evaluation Low risk.pdf..pdf
  • Invitation to Tender Shunts Cores 09102026.pdf..pdf
  • NEC-Complete Supply Contract-Transformer cores and shunts .pdf..pdf
  • E-tendering Help Manual for supplier - 27 January 2025.docx
  • 240-106084675 Annexure C 3.docx
  • 240-126469599 (Rev 2) - Method Statement - Template.docx
  • 240-108987034 Environmental Tender Evaluation and Scoring Card (High, Medium and Low risk work).docx
  • Invitation to Tender Shunts Cores 09102026.pdf
  • Shunts and cores Scope of Work.pdf
  • 240-12248652_List of Tender Returnables_Cat 4_ Rev 7.pdf
  • 240-105658000 Supplier QM Spec Rev 3-QM 58.pdf
  • Contractor Health and Safety Requirements (Latest Revision) (2).pdf
  • 240-68099512 Form A_Cat 4_ Rev 9.pdf
  • Functional evaluation criteria- shunts and cores - Annexure 1.pdf
  • NEC-Complete Supply Contract-Transformer cores and shunts .pdf
  • 240-106084675 Annexure C3 OHS Tender Evaluation Low risk.pdf
  • 240-77471499 (2) Annexure B - Acknowledgement Form for Eskom SHE Rules and other Requirements (2).pdf
Sign up free to download the documents.
Sources

Want tenders like this one in your inbox?

Create a free account to search every open tender and download the documents.