BidWunder

This tender closed on 31 Aug 2026. The page stays up for reference. See open tenders from Eswatini Electricity Company.

ENGINEERING PROCUREMENT CONSTRUCTION (EPC) CONTRACTOR PLUS FINANCE FOR AN ADDITIONAL 10MW HYDROPOWER GENERATING UNIT AT THE EXISTING MAGUGA HYDROPOWER STATIONClosed

Eswatini Electricity CompanyRFP 001 of 2026/2027

Summary

AI-generated from the tender documents.

Overview

The procurement is an Engineering Procurement Construction (EPC) contract with financing for an additional 10 MW hydropower generating unit at the Maguga Hydropower Station. Bidders should be experienced EPC contractors with the ability to arrange project financing and to deliver hydroelectric expansion projects.

Requirements

  • Proven track record in EPC delivery of hydroelectric projects of a similar scale
  • Ability to provide or arrange project financing (contractor-plus-finance model)
  • Compliance with applicable energy sector procurement regulations and relevant safety/local content expectations

How to Apply

  • Submission deadline: 2026-08-31 09:00
  • Submission method: not specified in the metadata
  • Documents to complete/submit: not specified in the metadata
  • Pre-qualifications/registrations: not specified in the metadata
  • Briefing session: not specified in the metadata
  • Bid documents: no attachments provided; location to obtain documents not specified
Description

ENGINEERING PROCUREMENT CONSTRUCTION (EPC) CONTRACTOR PLUS FINANCE FOR AN ADDITIONAL 10MW HYDROPOWER GENERATING UNIT AT THE EXISTING MAGUGA HYDROPOWER STATION

Documents
  • Tender Document
Sign up free to download the documents.
Sources

Want tenders like this one in your inbox?

Create a free account to search every open tender and download the documents.