IMPLEMENTATION OF PROTECTION STUDY AND THE SUPPLY OF ASSOCIATED EQUIPMENT FOR THE ELECTRICITY NETWORK IN WITZENBERG MUNICIPAL AREA FOR A MULTI YEAR PERIOD UP TO 30 JUNE 2029
Summary
AI-generated from the tender documents.
Overview
The procurement is the implementation of a Protection Study and the supply of associated equipment for the electricity network in the Witzenberg Municipal area, on a multi-year basis up to 30 June 2029. Documents are available from 14 October 2026. Site meetings are planned. Bidders should be electrical engineering firms or contractors with experience in protection studies and equipment supply for municipal distribution networks, and possess relevant registrations/certifications.
Requirements
- Electrical engineering capability to perform protection studies for distribution networks.
- Ability to supply associated electrical equipment (e.g., protection hardware) and related services.
- Experience delivering municipal or multi-year electricity network projects.
Note: Specific qualifications, CIDB grading, registrations, and pre-qualifications are not detailed in the metadata.
How to Apply
- Submission deadline: 2026-11-20 10:00.
- Site briefing/meeting: Yes (details not provided in metadata).
- Submission method: Not specified.
- Documents to submit: Not specified.
- Required registrations/pre-qualifications: Not specified.
- Where to obtain bid documents: Not specified.
IMPLEMENTATION OF PROTECTION STUDY AND THE SUPPLY OF ASSOCIATED EQUIPMENT FOR THE ELECTRICITY NETWORK IN WITZENBERG MUNICIPAL AREA FOR A MULTI YEAR PERIOD UP TO 30 JUNE 2029 IMPLEMENTATION OF PROTECTION STUDY AND THE SUPPLY OF ASSOCIATED EQUIPMENT FOR THE ELECTRICITY NETWORK IN WITZENBERG MUNICIPAL AREA FOR A MULTI YEAR PERIOD UP TO 30 JUNE 2029 Documents available from: 14 October 2026 Site Meeting: Yes Municipality: Cape Winelands District Municipality
Want tenders like this one in your inbox?
Create a free account to search every open tender and download the documents.