BidWunder

This tender closed on 27 Jul 2026. The page stays up for reference. See open tenders from Central Electricity Board (CEB).

OAB-CPR-2026-10640 (IFB 11191) - DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TWO 1MW/2MWH BATTERY ENERGY STORAGE SYSTEMS FOR RODRIGUES ISLANDClosed

Central Electricity Board (CEB)OAB-CPR-2026-10640 (IFB 11191)

Summary

AI-generated from the tender documents.

Overview

This tender seeks the design, manufacture, supply, installation, testing and commissioning of two 1MW/2MWh Battery Energy Storage Systems for Rodrigues Island. Bidders with experience in electrical engineering, energy-storage system integration, and EPC delivery of grid-scale storage projects should consider bidding. The submission deadline is 2026-07-27 11:30.

Description

OAB-CPR-2026-10640 (IFB 11191) - DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TWO 1MW/2MWH BATTERY ENERGY STORAGE SYSTEMS FOR RODRIGUES ISLAND

Documents
  • Press Notice
Sign up free to download the documents.
Sources

Want tenders like this one in your inbox?

Create a free account to search every open tender and download the documents.