This tender closed on 09 Jul 2026. The page stays up for reference. See open tenders from Winnie Madikizela-Mandela Local Municipality.
Panel for Upgrading Surfaced Roads, Sidewalks and Stormwater for 18 MonthsClosed
Summary
AI-generated from the tender documents.
Overview
Panel for upgrading CBD roads, sidewalks and stormwater for 18 months. Bids from suitably qualified contractors (CIDB 5CE or higher) with roadworks capability should consider participating; scope covers CBD surfaced roads, sidewalks and stormwater, with an 18-month panel and formal GCC/COLTO/compliance requirements. Submissions are via email as per conditions.
Requirements
- CIDB contractor grading designation of 5CE or higher.
- VAT registration and Tax Compliance Status (TCS PIN) with SARS; if applicable, CSD number for bidders without TCS.
- Completion of returnable documents and bid forms: MBD1, MBD4, MBD6.1, MBD8, MBD9, plus other returnables (T2.2).
- Functionality: minimum 70% threshold to proceed to price evaluation (as per tender text).
- Local content: 100% minimum for designated sectors.
- Health and safety: compliance with OHSA 1993 Construction Regulations; provide Health and Safety Plan and declarations.
- Submission on official bid documents; no fraudulent documents; 90-day bid validity. (See attached document Panel for Surfaced RoadsSidewalks and Stormwater in the CBD for a Period of 18 Months.pdf for specifics.)
How to Apply
- Submission deadline: 09 July 2026 at 12:00.
- Submission method: email completed bid documents to tenders.scm@mbizana.gov.za (or quotes alternative for lower values per doc).
- Documents to complete/submit: MBD 1, MBD 4, MBD 6.1, MBD 8, MBD 9; C1.1 Form of Offer, C1.2 Contract Data, C2.2 Pricing, T2.2 Returnable Schedules.
- Registrations/pre-qualifications: VAT, SARS PIN/TCS; CSD if no TCS; CIDB 5CE+; local content declarations.
- Briefing/clarifications: Not applicable (no compulsory clarification meeting).
- Documents/source: bid documents are downloadable from etenders.gov.za (see attached). (Reference: Panel for Surfaced Roads... pdf)
Panel for Upgrading Surfaced Roads, Sidewalks and Stormwater for 18 Months Panel for Upgrading Surfaced Roads, Sidewalks and Stormwater for 18 Months Conditions: All submissions must be emailed to tenders.scm@mbizana.gov.za
- Panel for Surfaced RoadsSidewalks and Stormwater in the CBD for a Period of 18 Months.pdf..pdf
Want tenders like this one in your inbox?
Create a free account to search every open tender and download the documents.