BidWunder

This tender closed on 09 Aug 2026. The page stays up for reference. See open tenders from Kibali Goldmines SA.

PRJ-26-08-002-KGM - Dozer Hiring for ARK project (Kibali Gold Mine / Drilling Platform Preparation, Access Road Construction and Post-Drilling)Closed

Kibali Goldmines SAARSP-1785788852

Summary

AI-generated from the tender documents.

Overview

Dozer hiring services for the ARK project (Kibali Gold Mine), including drilling platform preparation, access road construction and post-drilling activities. Bid should be of interest to mining/construction contractors with heavy earthmoving equipment hire capacity and experience on mining sites, capable of mobilising to Kibali project.

Requirements

  • Capacity to provide dozers on hire for mining-site earthworks (drilling platform prep, road construction, post-drilling).
  • Proven experience in mining or heavy earthworks and remote-site mobilisation.
  • Compliance with safety, environmental and equipment maintenance standards; appropriate insurance and liability coverage.
  • Operator services (if required) and ability to meet project timelines.

How to Apply

  • Submission deadline: 2026-08-09 10:00 (Open Tender).
  • Submission method: not specified in metadata; obtain tender documents from the issuer.
  • Documents to complete/submit: not specified in metadata; refer to tender documents.
  • Pre-qualifications: not specified in metadata; refer to tender documents.
  • Briefing session: not specified.
  • Where to obtain bid documents: not attached in metadata; contact Kibali Goldmines SA.
Description

PRJ-26-08-002-KGM - Dozer Hiring for ARK project (Kibali Gold Mine / Drilling Platform Preparation, Access Road Construction and Post-Drilling)

Sources

Want tenders like this one in your inbox?

Create a free account to search every open tender and download the documents.