BidWunder

This tender closed on 22 Jul 2026. The page stays up for reference. See open tenders from SAFCOL.

PROVISION OF STACKING, BOILER FEEDING, STICKERS MANUFACTURING AND VELUE EXTRACTION SERVICES FOR A MONTH AT TIMBADOLA SAW MILLClosed

SAFCOLRFQ-TIM-268-2026

Summary

AI-generated from the tender documents.

Overview

RFQ for the Provision of Stacking, Boiler Feeding, Stickers Manufacturing and Value Extraction Services for a Month at Timbadola Saw Mill. SAFCOL invites bids from service providers with experience in sawmilling/forestry/agriculture and the ability to supply labour, transport and related services as specified in Annexure A of the RFQ document. (RFQ TIM 268 Stacking Boiler Feeding Stickers Manufacturing and Value Extraction Services.pdf)

Requirements

  • Demonstrate experience in managing a sawmilling/forestry/agriculture contract with verifiable references.
  • Register for tax compliance (SARS) and provide a Tax Clearance; CSD registration or MA AA number.
  • Provide latest BBBEE verification (SANAS) or sworn EME/QSE affidavit; signed SBD forms.
  • Proof of Compensation/COID compliance (Workman’s Compensation or equivalent) and Good Standing.
  • Provide fully completed RFQ and official quotation on company letterhead; ID copies of company directors.
  • Compliance with SAFCOL’s PPE standards, safety training, and labour transport/IR responsibilities; accommodation and daily timesheets.
  • Registration with National Treasury CSD within 7 working days of award if not already registered.
  • Acceptance of the 80/20 price-specific-goals evaluation framework (minimum 51% Black Ownership earns specific points).
  • Adherence to the supplier code of conduct and bidder disclosures.

How to Apply

  • Submission deadline: 22 July 2026 at 12:00 PM (late submissions not accepted). RFQ validity: 60 days. (RFQ TIM 268…)
  • Submission method: email quotations to RFQNorth@safcol.co.za; include the RFQ number in the email subject. Responses to RFQNorth@safcol.co.za; submissions to other inboxes will not be considered. (RFQ TIM 268…)
  • Documents to submit (fully completed): RFQ form, official quotation on letterhead, latest Tax Clearance, BBBEE certificate or sworn affidavit, CSD/MAAA number, ID copies of directors, SBD forms. (RFQ TIM 268…)
  • Briefing: none required (no compulsory briefing session). (RFQ TIM 268…)
  • Where to obtain bid documents: attached RFQ documents (Annexure A and related schedules) as part of the RFQ package. (RFQ TIM 268…)
  • Relevant documents referenced in Annexure A: Terms of Reference, delivery location (Timbadola Sawmill), staffing schedules, PPE requirements, and costing sheets. (RFQ TIM 268…)
Description

PROVISION OF STACKING, BOILER FEEDING, STICKERS MANUFACTURING AND VELUE EXTRACTION SERVICES FOR A MONTH AT TIMBADOLA SAW MILL

Documents
  • RFQ TIM 268 Stacking Boiler Feeding Stickers Manufacturing and Value Extraction Services.pdf
Sign up free to download the documents.
Sources

Want tenders like this one in your inbox?

Create a free account to search every open tender and download the documents.