BidWunder

This tender closed on 12 Oct 2026. The page stays up for reference. See open tenders from City of Tshwane.

RE-ADVERTISEMENT: APPOINTMENT OF AN ENGINEERING CONSULTING FIRM FOR THE DESIGN REVIEW, CONTRACT ADMINISTRATION AND SITE SUPERVISION FOR THE CONSTRUCTION OF A BULK WATER LINE, BULK SEWER LINE AND 20 Ml RESERVOIRS IN WINTERVELD EXT 3 AND 4 FOR A PERIOD OF 6 MONTHSClosed

City of TshwaneQ12-02-2026-27

Summary

AI-generated from the tender documents.

Overview

RE-ADVERTISEMENT: Appointment of an Engineering Consulting Firm for design review, contract administration and site supervision for the construction of a bulk water line, bulk sewer line and 20 Mℓ reservoirs in Winterveld Ext 3 and 4 for a period of 6 months. City of Tshwane seeks a professional service provider with registered engineers (ECSA) and proven experience in reservoir design and water/sewer reticulation projects to perform design reviews, contract administration and site supervision (6 months).

Requirements

  • Mandatory personnel and qualifications:
    • Project Leader: BSc/BTech Civil; ECSA Engineer/Technologist; ≥5 years post-registration in reservoir design
    • Civil Engineer: BSc/BTech Civil; ECSA; ≥5 years post-registration in water/sewer design
    • Structural Engineer: BSc/BTech Civil; ECSA; ≥5 years post-registration in water/sewer design
    • Engineer’s Representative: BSc/BTech Civil; ECSA; ≥3 years post-registration
  • Experience criteria (documented):
    • At least one reinforced concrete reservoir project
    • At least one bulk water and/or sewer reticulation project
    • CVs for key staff detailing relevant experience
    • Proof of registrations and qualifications (returnable schedules RD.A.8, RD.A.10)
  • Evaluation:
    • Minimum 70 points to be eligible, with functionality scored by multiple evaluators
    • Scored on reservoir experience, reticulation projects, and staff experience (as per RD schedules)
  • Compliance:
    • Proof of Professional Indemnity Insurance
    • Adherence to specified contract standards and reference documents (CIDB/NEC3 context)
  • Returnable and contract documents to be completed as part of submission (see above)

How to Apply

  • Submission deadline: 12 October 2026 at 10:00 (online only) (see documents)
  • Briefing session: 6 October 2026 at 10:00 (compulsory) (see documents)
  • Submission method: online via the City of Tshwane portal or etenders portal; hardcopies not accepted
  • Documents to submit:
    • Returnable documents (T2) and all sections listed in Part T2
    • Form of Offer and Acceptance; Pricing Schedule (C2.2); Contract Data (Part C2/C1)
    • CVs and proof of professional registrations; project letters and completion certificates for relevant works
    • Any deviations signed after acceptance
  • Registrations/pre-qualifications:
    • Demonstrate ECSA registration for engineers; meet CIDB/standards referenced in documents
  • Where to obtain bid documents:
    • Download from the City of Tshwane site or etenders (document filename references: Q12-02-2026/27 QUOTATION DOCUMENTATION.pdf)
Description

RE-ADVERTISEMENT: APPOINTMENT OF AN ENGINEERING CONSULTING FIRM FOR THE DESIGN REVIEW, CONTRACT ADMINISTRATION AND SITE SUPERVISION FOR THE CONSTRUCTION OF A BULK WATER LINE, BULK SEWER LINE AND 20 Ml RESERVOIRS IN WINTERVELD EXT 3 AND 4 FOR A PERIOD OF 6 MONTHS

Documents
  • Q12-02-2026-27
  • Q12-02-2026-27 QUOTATION DOCUMENTATION.pdf..pdf
  • Q12-02-2026-27 QUOTATION DOCUMENTATION.pdf
Sign up free to download the documents.
Sources

Want tenders like this one in your inbox?

Create a free account to search every open tender and download the documents.