Supply, delivery and installation of New Hydrogen H2 Production Plant for a period of 11 months at Kendal Power Station.Closed
Summary
AI-generated from the tender documents.
Overview
Supply, delivery and installation of a New Hydrogen H2 Production Plant at Kendal Power Station for an 11-month period. Firms with experience in EPC-style delivery of industrial plants, hydrogen or gas-processing equipment, and NEC3 ECC contracts should consider bidding.
Requirements
- Proven experience delivering hydrogen production or similar industrial plants.
- Ability to design, fabricate, FAT/SAT, install, commission, train and hand over under the NEC3 ECC3 framework.
- Capability to provide contract securities: a 10% Performance Bond and retention terms as per the contract data; optional parent-company guarantees or retention guarantees may apply (as per NEC3 options).
- Compliance with health, safety and environmental requirements and robust risk management, including safety file, inductions and site controls.
- Adequate insurances in line with Insurance Tables A/B (covers works, plant, liability, etc.).
- POPIA compliance for handling shared personal information (data processing and notification obligations).
- Access to bid documents via the attached tender package (Tender documents (33 files).zip) and submission must align with the contract data and returnable documents.
How to Apply
- Submission deadline: 29 October 2026 at 08:00 (closing date).
- Submission method: Electronic submission accepted.
- Documents to complete/submit: NEC3 ECC3 tender documents (Form of Offer and Acceptance, C1, C2, etc.) within the attached Tender Documents (33 files).zip.
- Pre-qualification/registrations: Not explicitly listed in the available text; verify in the bid pack.
- Briefing session: Not specified in the provided material.
- Where to obtain bid documents: Tender documents (33 files).zip (download from the tender portal link provided with the metadata).
Supply, delivery and installation of New Hydrogen H2 Production Plant for a period of 11 months at Kendal Power Station. Supply, delivery and installation of New Hydrogen H2 Production Plant for a period of 11 months at Kendal Power Station. Tender Office Location: Kendal Power Station
- Tender documents (33 files).zip
Want tenders like this one in your inbox?
Create a free account to search every open tender and download the documents.