SYSTÈME D’ALIMENTATION SANS COUPURE PAR BATTERIE (BESS) DE L’USINE D’ACIDE DE MUMI
Mutanda MiningARSP-1791983677
Summary
AI-generated from the tender documents.
Overview
Open tender for the design, supply, installation and commissioning of a Battery Energy Storage System (BESS) for Mutanda Mining’s MumI acid plant. The call is for a turnkey BESS solution; bidders with electrical power systems, energy storage, and industrial EPC capabilities should consider bidding.
Requirements
- No specific qualification criteria are published in the available metadata.
How to Apply
- Submission deadline: 2026-11-02 10:00.
- The metadata does not specify submission method, required documents, registrations, or briefing sessions.
- No bid documents are attached; confirm with the issuer for document access.
Description
SYSTÈME D’ALIMENTATION SANS COUPURE PAR BATTERIE (BESS) DE L’USINE D’ACIDE DE MUMI
Sources
Want tenders like this one in your inbox?
Create a free account to search every open tender and download the documents.