BidWunder

This tender closed on 28 Jul 2026. The page stays up for reference. See open tenders from Eskom - Generation.

The data acquisition system (DAS) performs all the online vibration monitoring functions on the main turbine (MT), electrical feed pumps (EFP) A&B and the steam feed pump turbine (SFPT) at Arnot Power Station for 3 years (36 months)”Closed

Eskom - GenerationE3047GXMPARNC

Summary

AI-generated from the tender documents.

Overview

Procurement of a data acquisition system (DAS) for online vibration monitoring on the main turbine (MT), electrical feed pumps (EFP) A&B, and the steam feed pump turbine (SFPT) at Arnot Power Station for 36 months. Bidders should have expertise in instrumentation, vibration analysis, data acquisition, and plant equipment monitoring for large-scale power generation facilities, with capabilities to install, commission, and maintain DAS in a live plant environment.

Requirements

  • Proven experience with DAS for vibration monitoring of rotating equipment in power plants.
  • Ability to integrate DAS with plant control/SCADA systems and provide data analysis/reporting.
  • Relevant certifications/competencies in electrical/instrumentation work and safety for live plant operations.

How to Apply

  • Submission deadline: 2026-07-28 08:00.
  • Tender office: Arnot Power Station; Issuer: Eskom - Generation; Tender type: Expression of Interest.
  • Submission method: not specified in metadata.
  • Documents to submit: not specified.
  • Registrations/Pre-qualifications: not specified.
  • Briefing session: not specified.
  • Where to obtain bid documents: not specified.
Description

The data acquisition system (DAS) performs all the online vibration monitoring functions on the main turbine (MT), electrical feed pumps (EFP) A&B and the steam feed pump turbine (SFPT) at Arnot Power Station for 3 years (36 months)” The data acquisition system (DAS) performs all the online vibration monitoring functions on the main turbine (MT), electrical feed pumps (EFP) A&B and the steam feed pump turbine (SFPT) at Arnot Power Station for 3 years (36 months)” Tender Office Location: Arnot Power Station

Documents
  • Tender documents (1 files).zip
Sign up free to download the documents.
Sources

Want tenders like this one in your inbox?

Create a free account to search every open tender and download the documents.