BidWunder

This tender closed on 11 Sept 2026. The page stays up for reference. See open tenders from Swartland Municipality.

UPGRADING OF BULK WATER PIPELINE: WESBANK RESERVOIR TO MALMESBURY / ABBOTSDALE, PHASE 2Closed

Summary

AI-generated from the tender documents.

Overview

Upgrading of Bulk Water Pipeline from Wesbank Reservoir to Malmesbury/Abbotsdale: Phase 2, a construction project. Tender is targeted at civil engineering/construction firms with CIDB CE class registration and a suitable grading. The estimated contract value is between R10 million and R20 million. Preferences are available under the 80/20 system for bidders meeting B-BBEE and locality criteria, with eligibility limited to those meeting Tender Data criteria.

Requirements

  • CIDB registration in CE class with grading equal to or higher than that determined for the tendered sum (or compliant with Regulation 25).
  • Estimated contract value between R10 million and R20 million.
  • Eligibility criteria as stated in the Tender Data; only those meeting them may submit.
  • Non-refundable tender fee of R530, payable prior to collection (cash or EFT to Swartland Municipality).
  • Tender documents available only in hard copy; allow 2 business days for EFT clearance.
  • Compulsory Clarification Meeting: 21 August 2026 at 10:00; venue Banquet Hall, Malmesbury; registration closes 10:05.
  • Annexure MBD 6.1 must be completed to claim preference points; B-BBEE verification certificates and locality proof must accompany bids.
  • Duly completed tenders in sealed envelopes to be deposited before 12:00 on 11 September 2026.
  • Late tenders will not be accepted; no submission by telephone, facsimile, or e-mail.
  • Queries: Mr Johan du Plessis and Mr Esias de Jager available for information (see notice for contact details).

How to Apply

  • Submission deadline and briefing: Compulsory Clarification Meeting on 21 August 2026 at 10:00 (registration closes 10:05) (Notice: T02.26.27 Upgrading Bulk Water Pipeline Wesbank Reservoir(Notice).pdf).
  • Submission method: Place a duly completed tender in a sealed envelope marked with the tender number and bidder details, deposited in the tender box at the Municipal Offices, 1 Kerk Street, Malmesbury, before 12:00 on 11 September 2026.
  • Documents to submit: Completed tender documents, Annexure MBD 6.1, original/valid B-BBEE Status Level Verification Certificate or certified copies, and Proof of Locality.
  • Pre-qualifications/registrations: CIDB CE class registration with appropriate grading; compliance with Tender Data eligibility criteria.
  • Briefing session details: See above (mandatory).
  • Where to obtain bid documents: Hard-copy documents available for collection from the Swartland Municipality offices; collection starts 11 August 2026 (2 days EFT clearance).
  • Contacts for queries: Mr Johan du Plessis (johandp@bviwc.co.za; 082 561 8697) and Mr Esias de Jager (022 487 9400).
Description

UPGRADING OF BULK WATER PIPELINE: WESBANK RESERVOIR TO MALMESBURY / ABBOTSDALE, PHASE 2 UPGRADING OF BULK WATER PIPELINE: WESBANK RESERVOIR TO MALMESBURY / ABBOTSDALE, PHASE 2 Documents available from: 11 August 2026 Site Meeting: Yes Municipality: West Coast District Municipality

Documents
  • T02.26.27 Upgrading Bulk Water Pipeline Wesbank Reservoir(Notice).pdf..pdf
  • T02.26.27 Upgrading Bulk Water Pipeline Wesbank Reservoir(Notice).pdf
Sign up free to download the documents.
Sources

Want tenders like this one in your inbox?

Create a free account to search every open tender and download the documents.